Troubleshooting after soldering and wiring installation For our group situation, we got six battery boxes, six LED strips and six force sensors to soldering onto the pcb board, which means there would be loads of wires to deal with. This is one of the biggest problems our team needs to face and deal with…
Author: guli7204
week 11-12# Team 9 Loki Troubleshooting and Debug process
Troubleshooting and debug process During the final development for our studio project, the first thing team Loki met is the wires connection issue after the LED strips are cut into half. We soldering the GND and 5v points directly with the wires from battery box, which is wrong and can cause data miss-communication and LED…
Week 10 &11 installation diagram
Week 11 Interactive system installation diagram and explanation For the site installation on Saturday night event, there two main section. First installation section is about the IMU sensor, as the team replace that with mobile phone IMU, the mobile phone IMU will go into skater’s pocket. Another installation section is near the benches as…
Protected: IDEA9201 Lab2 assignment2 guli7204
There is no excerpt because this is a protected post.
Week 5# team 9 Summarizes the research & initial concept & presentation
After background research, site research and user research, our group summarized all contents and found the connection between them. Some problem statements are founded: The entertaining of Sydenham skate park currently is not enough, there is an opportunity for students to explore the method to improve that. The skate park needs to be much more…
Group 9 Loki week 3 & week 4 meeting
Meeting #1, Date: 21, Aug, 2018 Place: Wilkinson Background Research 1.Share the resource from our background research investigation in this meeting 2.Find problems and useful information from our background research. The design direction we currently decided. Skaters prefer the street terrain rather than Transition terrain Skater The design of the skate-park should be…